Foundation capacity
Check operating weight, foundation and lifting route.


A large plate pack is coordinated with power-plant pipework, operating platforms and service clearance for inspection and maintenance.

Installing a large exchanger involves foundation capacity, pipe loads, connection orientation, access platforms and plate-removal space. The photographs show a clear engineering relationship between the large frame, plant pipework, platforms and surrounding access.
Check operating weight, foundation and lifting route.
Use suitable supports and flexibility to control nozzle loads.
Platforms provide access to instruments, valves and observation points.
The follower travel and handling path require adequate clearance.

Project photographs retain the actual equipment, pipework and industrial environment. The analysis describes visible structure, installed quantity, connections and access; photographs are not used to invent efficiency or energy-saving figures.
It enables safe access to elevated connections, valves and instruments.
Unreasonable pipe loads should not be transferred to the equipment.
No. Use the frame drawing, follower travel and plate-handling method.
Send the fluids, temperatures, flow, pressure or existing-equipment details for selection and configuration support.